The ENDING DATE for Winter Load Increases
and STARTING DATE for Spring Load Restrictions in the CENTRAL, NORTH-CENTRAL
and NORTH FROST ZONES will be Friday, March 29, 2013 at 12:01 AM .
Spring Load Restrictions are already in
effect in the SOUTH, SOUTHEAST and METRO FROST ZONES.
Road Restriction maps indicating the
locations of weight restricted routes and those state highways open to maximum
ten-ton axle weights are listed on the MnDOT Seasonal Load Limits website at
www.dot.state.mn.us/materials. Click on “Seasonal Load Limits,†then click
on “Spring Load Restrictions (SLR ).†Also available is a text list of the restricted segments
along with exceptions to the map.
OVERWEIGHT PERMITS
Permits for over 80,000 GVW will continue
and new permits will be issued if all axle and group weights are legal.
Existing middle-range and full-summer overweight permits end when Winter Load
Increases are removed. No middle-range or full-summer overweight permits are
issued during the Spring Load Restriction period. Middle-range overweight
permits become available within each frost zone when Spring Load Restrictions
are lifted. Full-summer overweight permits become available within each frost
zone starting two to three weeks after Spring Load Restrictions are lifted.
For questions about enforcement call:
Minnesota Department of Public Safety
State Patrol - Commercial Vehicle Enforcement
651-405-6171 (select Option 3, Option 3)
Minnesota Department of Public Safety
State Patrol - Commercial Vehicle Enforcement
651-405-6171 (select Option 3, Option 3)
For questions about over legal weight/size
"heavy haul" trucking call:
Minnesota Department of Transportation
Freight and Commercial Vehicle Operations - Oversize/Weight Permits
651‑296-6000
Minnesota Department of Transportation
Freight and Commercial Vehicle Operations - Oversize/Weight Permits
651‑296-6000
The ending dates for Spring Load
Restrictions are based on how weather is affecting roadway strength. These
dates are established by monitoring roadway strength as weather conditions
change. Therefore, the ending dates for Spring Load Restrictions are variable.
As soon as a date is set, MnDOT will
report this date on its 24-hour automated message center at
1‑800‑723‑6543 for the USA and Canada , and locally at 651‑366‑5400 for the
Minneapolis/St Paul area. This information is also published on the MnDOT
Seasonal Load Limits website: www.dot.state.mn.us/materials.