I-94 traffic will remain a single lane in
each direction, head-to-head until early July, with the exception of Memorial
Day weekend.
Motorists travelling I-94 between the
Twin Cities Metro Area and St. Cloud should expect major delays in both
directions of the interstate between Clearwater and St. Cloud . Traffic forecasts show initial backups
could extend five to seven miles, with summertime backups of 20 miles or more
possible during peak travel periods. The longest backups are expected for weekend
travelers.
Motorists
should plan alternate routes, allow extra time for travel and check www.511mn.org for real-time traffic information prior
to travel.
When complete, the project will result in
a smoother ride, improved drainage and reduced short-term maintenance costs on
7.5 miles of busy interstate.
For detailed project information,
including current schedule, travel information and tips on navigating during
construction, or to sign up for project email updates, please visit the
project’s website: www.mndot.gov/d3/i94/.
Statewide traffic, construction and
travel information is available at www.511mn.org,
or call5-1-1 .
or call