Crews will temporarily be operating heavy equipment along
the highway shoulder, and Right of Way, to clear the culvert and install a new
liner. Weather permitting, work will typically last only a day or two at each
location. The overall project will last through December.
Subsurface Inc. and Veit & Company Inc. are contractors
for these cure-in-place improvements. They will improve drainage and prolong
the life of the culvert.
MnDOT urges motorists to always drive with caution, slowdown
in work zones and never enter a road blocked with barriers or cones.
For more updates on this, and other projects in the region
follow us on Twitter @mndotnorthwest, or log on to www.511mn.org for real-time
travel information anywhere in Minnesota .