Traffic will be reduced to a
single lane controlled by flaggers from approximately 8:30 a.m. to 4 p.m. Both lanes will be open each evening after crews have
completed their work.
The lane closure will remain
in effect through Tuesday, Aug. 27, weather permitting.
Motorists should always drive
with caution, slowdown in work zones and never enter a road or lane blocked
with barriers or cones.
For more updates on this, and
other projects in the region follow us on Twitter @mndotnorthwest, or log on to
www.511mn.org for real-time travel information anywhere in Minnesota .